CEC • Quality Control Management System

Built an app from 0 to 1 – A system to help construction workers document sites more easily

Role

Product Designer

Team

2 Designers, 2 Developers, 1 PM

Timeline

5 months

The construction industry has long struggled with the adoption of new technologies and digital tools. Throughout this project, my focus was on creating an intuitive system that construction workers could easily adopt, ensuring a smooth and efficient transition from traditional methods to the digital solution I built.

Outcome

52%

of Inspection forms are now

filled out and submit via the app

2 hrs

Form completion time has decreased

2 weeks to within 2 hours

Problem

Quality Control (QC) is mandatory in construction project. Throughout the QC process, inspection forms are required at each QC stage and are checked and filled out by subcontractors.


" Inspection Form contains errors and Review paper inspection form is time-consuming "

Timeline

Introduction of CEC

a construction company that manages the planning, design, and execution of building projects, including infrastructure, transportation, and large public works.

Final Designs
and Solutions

Over five months, I drafted multiple design strategies and crafted various wireframes, and discussed them with quality control department to do rapid test and meet user needs.

Onsite - document and inspection right away

Document Inspection detail and attach photos once users finished their work tasks.


Digital Signature - Sign when click approved

Users no longer need to print documents or wait for a supervisor’s approval, and they don’t have to wonder how long the process will take.

Office - complete forms after working on site

Edit inspection forms online if subcontractors can't fill it on site

User Research
and Findings

To better understand the construction industry work environment and user workflows, my team and I conducted 10 user interviews and made 2 site visits to observe users.

Finding 1

Finding 1

All the data is stored in individual files and saved locally

Construction workers can't fill out the form on-site, so they end up taking quick notes on scraps of paper or on their phones.

Finding 2

Finding 2

Involve multiple stakeholders within a single inspection form

Once workers complete the inspection, various stakeholders need to review the material and provide approval.

Finding 3

Finding 3

Work environment is humid and messy, and sometimes there is no internet connection.

They can't bring paper inspection forms to the site due to the harsh environment.

Finding 4

Finding 4

Finding 4

Takes 2 weeks to complete one inspection form

Takes 2 weeks to complete one inspection form

Takes 2 weeks to complete one inspection form

there’s no system to track where the form is or how far along it is in the process. This makes it hard to manage and speed up the paperwork.

Design Exploration

Over five months, I drafted multiple design strategies and crafted various wireframes, and discussed them with quality control department to do rapid test and meet user needs.

Design Challenge

Design Flexible Inspection Completion Options

Workers are unable to complete the inspection forms onsite when there is no internet or they are working on more hazardous construction tasks

01

01

01

Identify different scenarios and the situations users may encounter.

Identify different scenarios and the situations users may encounter.

Identify different scenarios and the situations users may encounter.

02

02

02

Define the strategy with stakeholders

Define the strategy with stakeholders

Define the strategy with stakeholders

Lo-fi and sketches

During the communication, I also conducted quick sketches and wireframes to discuss with the customer service team how I would design and what my assumptions were.

Final Designs
and Solutions

Over five months, I drafted multiple design strategies and crafted various wireframes, and discussed them with quality control department to do rapid test and meet user needs.

Design Solution 1

Design Solution 1

Design Solution 1

Type in notes and attach photos on site

Type in notes and attach photos on site

Type in notes and attach photos on site

Step 1 - Form Management

Complete certain inspection forms based on their assigned work tasks

Step 2 - In progress

Categorize the different stages to understand the overall work quality

Step 3 - Inspection List

Fill out forms and check the status of each item

Step 4 - Detail Editing

Attach photos and type in details to decide pass or fail

Prototype

Streamline workflow for subcontractors

Prototype

Digital Signature to review on phone as well

Design Solution 2

Design Solution 2

Design Solution 2

Switch to offline mode if the internet connection is poor

Switch to offline mode if the internet connection is poor

Switch to offline mode if the internet connection is poor

Step 1 - Offline

Switch to offline mode to download forms to local

Step 2 - Type in text only

Pop up notification when users attempt to upload photos

Step 3 - Switch to online

Automatically display a popup and switch to online mode when an internet connection is detected

Prototype

Offline mode

Office - complete forms after working on site

Edit inspection forms online if subcontractors can't fill it on site